50 signatures reached
To: Environment Agency
Pumping Station
To build a pumping station at the end of east marsh drain on Immingham Dock
Why is this important?
At present surface water runs into east marsh drain which serve most of Immingham and surrounding villages, when we have a high tide the sluice gates which are located on Immingham docks are closed and the surface can not escape, And this causes the water to build up and ventuly causes flooding in the town,
By building a pumping station on the dock this would allow the water to be pumped 24/7 into the Humber and would stop flooding and with all this proposed development of new houses in Immingham this is vital this done
By building a pumping station on the dock this would allow the water to be pumped 24/7 into the Humber and would stop flooding and with all this proposed development of new houses in Immingham this is vital this done