Skip to main content

To: Environment Agency

Pumping Station

To build a pumping station at the end of east marsh drain on Immingham Dock

Why is this important?

At present surface water runs into east marsh drain which serve most of Immingham and surrounding villages, when we have a high tide the sluice gates which are located on Immingham docks are closed and the surface can not escape, And this causes the water to build up and ventuly causes flooding in the town,
By building a pumping station on the dock this would allow the water to be pumped 24/7 into the Humber and would stop flooding and with all this proposed development of new houses in Immingham this is vital this done
North East Lincolnshire

Maps © Stamen; Data © OSM and contributors, ODbL

Category

Updates

2017-09-16 11:30:07 +0100

50 signatures reached

2017-09-12 18:22:55 +0100

25 signatures reached

2017-09-12 13:34:58 +0100

10 signatures reached