To: Mark Carne Railtrack CEO

Fix the Chanterlands Ave Railway Bridge

To honor the undertakings made to the representatives of the Chanterlands Ave Community by Network Rail executives. These undertakings were to carry out a structural survey, fix the drainage issues that create slime and discoloration on the walls of the walkways under the bridge and a general repair and decoration of the bridge.

Why is this important?

The bridge is in a poor state and urgently needs work. Representatives met with local people and promised to do something six months ago. Until Network Rail have completed their work , the damage done to the heritage tiles, railings and lighting cannot be fixed.

The walls are coated in slime and it is on a busy school and shopping route. It is ugly and unhealthy.